Section of Westbound I-30 Left Lane Closed Feb. 11-15 for Bridge Construction
New lane closures are planned for the next two weeks as part of the $233 million Interstate 30/SH 360 Interchange Project.
Aerial photos of the project are available on the Keep 30360 Moving website.
Weekly Lane Closure Look Ahead
Closures are subject to changes due to weather and schedule. Below are anticipated traffic impacts for the coming week.
Interstate 30 Westbound Main Lanes (Great Southwest Parkway to SH 360)
Continuously, from 9 p.m. February 11 through 5 a.m. February 15, the westbound I-30 left lane will be closed between Great Southwest Parkway and SH 360 for bridge construction. Expect delays. Seek alternate routes.
Interstate 30 HOV Lanes (between Great Southwest Parkway and Cooper St.)
- Continuously, from now through fall 2020, the westbound I-30 HOV lane west of SH 161 will be closed. TEXpress lane traffic will be directed into the I-30 westbound general main lanes west of SH 161.
- From now through fall 2020, the eastbound HOV lane access between Center St. and Duncan Perry Road will be closed. TEXpress lane traffic will enter at SH 161.
SH 360 Northbound Main Lanes (Six Flags Drive to Lamar Boulevard)
- Overnight on February 6, from 9 p.m. to 5 a.m., the northbound SH 360 right, outside lane will be closed approaching SH 360 for asbestos remediation.
SH 360 Southbound Entrance Ramp from Six Flags Drive
- From 9 a.m. to 3 p.m. February 6, the southbound entrance to SH 360 from Six Flags Drive will be closed for safety guardrail repair. Traffic may use entrance ramps available from Lamar Boulevard or from Division Street.
Local Streets
- Lamar Boulevard/Ave H: From now through winter 2017, westbound and eastbound Lamar Boulevard/Ave H will be reduced to one lane approaching SH 360 for construction of a new southbound frontage road intersection.
- Avenue F: From now through summer 2017, eastbound and westbound Ave F traffic will be reduced to one lane each direction and shifted to the south side of Ave F for reconstruction of Ave F.
- Avenue G: From now through winter 2017, the 800 block of Avenue G is limited to westbound traffic movement.
- Permanent: Copeland Rd. between Six Flags Dr. and the SH 360 southbound frontage road will be closed.
- Permanent: Westbound Copeland Road from Six Flags Drive to just east of Ballpark Way has been permanently closed. Only eastbound Copeland Rd. traffic will be allowed between Ballpark Way and Six Flags Dr. Copeland Rd. between Six Flags Dr. and the SH 360 southbound frontage road will be closed.
- Continuously: Eastbound Copeland Rd. between Ballpark Way and Six Flags Dr. is reduced to one lane for general construction.
To stay up-to-date on the Interstate 30/SH 360 Interchange Project, visit www.keep30360moving.org.
Enhance Regional Mobility, I-30/SH 360 Interchange, Street Construction Projects
Headlines, News, Traffic Update, Transportation